| Spree/Pre-Order History - Tokyo Fashion | |||
Batch #54 - Completed |
|||
Date |
Status |
Remarks |
|
19 Mar 2012 |
Open |
Open for ordering till 27 Mar, 6pm |
|
27 Mar 2012 |
Closed |
Closed. Consolidating orders. |
|
28 Mar 2012 |
Pending replenishment |
Order pending stock replenishment. ETA TW 09 Apr. |
|
09 Apr 2012 |
Shipment sent |
Full shipment sent. ETA SG 20 Apr. (for FDO3686, 3689, 3694, 3695, 1 from Batch 52, 2 from Batch 53) |
|
17-18 Apr 2012 |
Completed |
All items mailed/delivered (except orders combined with other sprees) |
|
Batch #53 - Completed |
|||
Date |
Status |
Remarks |
|
07 Mar 2012 |
Open |
Open for ordering till 16 Mar, 6pm |
|
15 Mar 2012 |
Spree closed |
Closing earlier on 15 Mar, 8pm |
|
15 Mar 2012 |
Pending replenishment |
Order pending stock replenishment. ETA TW 27 Mar. |
|
27 Mar 2012 |
Shipment pending |
Partial shipment expected to be sent by this week. 2 pending items will be shipped with Batch 54. |
|
29 Mar 2012 |
Shipment sent |
Partial shipment sent. ETA SG 12 Apr. (for FDO3675, 3676, 3677, 3679, 3681, 3684) |
|
04-07 Apr 2012 |
Shipment arrived |
All items mailed/delivered |
|
17-18 Apr 2012 |
Completed |
Pending items mailed/delivered |
|
Batch #52 - Completed |
|||
Date |
Status |
Remarks |
|
20 Feb 2012 |
Open |
Open for ordering till 02 Mar, 6pm |
|
02 Mar 2012 |
Closed |
Consolidating orders |
|
03 Mar 2012 |
Pending replenishment |
Order pending stock replenishment. ETA TW 16 Mar. |
|
19 Mar 2012 |
Partial shipment |
Partial shipment sent. ETA SG 30 Mar (for FDO3663, 3664, 3665, 3666, 3668, 3672). 3 pending items will be shipped with Batch 54. |
|
23-26 Mar 2012 |
Shipment arrived |
All items mailed/delivered |
|
17-18 Apr 2012 |
Completed |
Pending items mailed/delivered |
|
Batch #51 - Completed |
|||
Date |
Status |
Remarks |
|
30 Jan 2012 |
Open |
Open for ordering till 10 Feb, 10pm (may be extended depending on response) |
|
10 Feb 2012 |
Closed |
Consolidating orders |
|
11 Feb 2012 |
Pending replenishment |
Order pending stock replenishment. ETA TW 27 Feb. |
|
27 Feb 2012 |
Delayed |
1 more item pending arrival in TW. ETA 03 Mar. |
|
02 Mar 2012 |
Shipment Sent |
ETA SG 16 Mar 2012 |
|
08 Mar 2012 |
Shipment Arrived |
Preparing to send out packages |
|
10 Mar 2012 |
Completed |
All items mailed/delivered (except orders combined with other sprees) |
|
| Batch #50 - Completed | |||
Date |
Status |
Remarks |
|
05 Jan 2012 |
Open |
Open for ordering till 15 Jan, 10pm (items will not reach before CNY 2012) |
|
15 Jan 2011 |
Closed |
Closed. Consolidating orders. |
|
17 Jan 2012 |
Shipment Pending |
Pending replenishment. ETA TW 27 Jan. |
|
25 Jan 2011 |
Shipment Sent |
ETA SG 07 Feb 2012 |
|
28-29 Jan 2012 |
Shipment Arrived |
Items mailed/delivered |
|
| Batch #49 - Completed | |||
Date |
Status |
Remarks |
|
12 Dec 2011 |
Open |
Open for ordering till 31 Dec, 10pm (may be extended depending on response) |
|
31 Dec 2011 |
Closed |
Closed. Consolidating orders. |
|
03 Jan 2012 |
Shipment Pending |
Shipment will be sent by 05 Jan 2012 |
|
05 Jan 2012 |
Shipment Sent |
ETA SG 18 Jan 2012 |
|
11 Jan 2012 |
Shipment Arrived |
Items mailed/delivered (except those pending balance items from other sprees) |
|
| Batch #48 (Private Spree) - Completed | |||
| Batch #47 - Completed | |||
Date |
Status |
Remarks |
|
24 Oct 2011 |
Open |
Open for ordering till 05 Nov, 10pm |
|
05 Nov 2011 |
Closed |
Pending replenishment. ETA TW 11 Nov. |
|
09 Nov 2011 |
Shipment Sent |
ETA SG 21 Nov. |
|
15-17 Nov 2011 |
Shipment Arrived |
All items mailed/delivered. |
|
| Batch #46 - Completed | |||
Date |
Status |
Remarks |
|
02 Oct 2011 |
Open |
Open for ordering till 10 Oct, 6pm |
|
11 Oct 2011 |
Closed |
Pending replenishment, ETA TW 28 Oct. |
|
27 Oct 2011 |
Shipment Sent |
ETA SG 11 Nov |
|
03-04 Nov 2011 |
Shipment Arrived |
All items mailed/delivered |
|
| Batch #45 - Completed | |||
Date |
Status |
Remarks |
|
18 Sep 2011 |
Open |
Open for ordering till 27 Sep, 6pm |
|
27 Sep 2011 |
Closed |
Pending replenishment, ETA TW 13 Oct. |
|
12 Oct 2011 |
Shipment Sent |
Shipment sent. ETA SG 28 Oct. |
|
19-20 Oct 2011 |
Completed |
Shipment arrived.
All items mailed/delivered. |
|
| Batch #44 - Completed | |||
Date |
Status |
Remarks |
|
01 Sep 2011 |
Open |
Open for ordering till 11 Sep, 6pm |
|
11 Sep 2011 |
Pending replenishment |
ETA TW 16 Sep |
|
14 Sep 2011 |
Shipment sent |
ETA SG 29 Sep |
|
24-26 Sep 2011 |
Shipment Arrived |
All items mailed/delivered |
|
| Batch #43 - Completed | |||
Date |
Status |
Remarks |
|
17 Aug 2011 |
Open |
Open for ordering till 26 Aug, 6pm |
|
26 Aug 2011 |
Pending replenishment |
ETA TW 07 Sep |
|
09 Sep 2011 |
Shipment sent |
ETA SG 23 Sep |
|
22 Sep 2011 |
Shipment arrived |
All items mailed/delivered |
|
| Batch #42 - Completed | |||
Date |
No. of Items |
Remarks |
|
20 Jul 2011 |
- |
Open for ordering. Closing on 05 Aug, 6pm. |
|
06 Aug 2011 |
- |
Closed. Pending replenishment. ETA TW 23 Aug. |
|
23 Aug 2011 |
- |
Shipment sent. ETA SG 06 Sep. |
|
06 Sep 2011 |
- |
Shipment delayed at Singpost's end. Will update when package has been delivered to us. |
|
09-10 Sep 2011 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #41 - Completed | |||
Date |
No. of Items |
Remarks |
|
27 Jun 2011 |
- |
Open for ordering. Closing on 08 Jul, 6pm. |
|
08 Jul 2011 |
- |
Extended to 12 Jul, 6pm |
|
12 Jul 2011 |
- |
Pending replenishment. Tentative ETA TW 21 Jul. |
|
20 Jul 2011 |
- |
Shipment sent. ETA SG 30 Jul. |
|
27 Jul 2011 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #40 - Completed | |||
Date |
No. of Items |
Remarks |
|
06 Jun 2011 |
- |
Open for ordering. Closing on 17 Jun, 6pm. |
|
17 Jun 2011 |
- |
Extended to 20 Jun, 6pm. |
|
20 Jun 2011 |
- |
Closed. Tentative ETA TW 01 July. |
|
01 Jul 2011 |
- |
Partial shipment sent. ETA SG 11 Jul. |
|
07-08 Jul 2011 |
- |
Partial shipment arrived & mailed out. |
|
20 Jul 2011 |
- |
Final shipment sent. ETA SG 30 Jul. |
|
29-30 Jul 2011 |
- |
Fulll shipment arrived & mailed out. |
|
| Batch #38 & #39 - Completed | |||
Date |
No. of Items |
Remarks |
|
13 May 2011 |
Batch 38 |
Open for ordering. Closing on 27 May, 6pm. |
|
27 May 2011 |
Batch 39 |
Open for ordering. Closing on 03 Jun, 6pm. |
|
03 Jun 2011 |
- |
Closed. Tentative ETA TW 10 Jun. |
|
10 Jun 2011 |
- |
Partial shipment sent. ETA SG 24 Jun. |
|
17-19 Jun 2011 |
- |
Partial shipment arrived. Items mailed/delivered. |
|
01 Jul 2011 |
- |
Final shipment sent. ETA SG 11 Jul. |
|
07-08 Jul 2011 |
- |
Final shipment arrived and delivered. |
|
| Batch #37 - Completed | |||
Date |
No. of Items |
Remarks |
|
22 Apr 2011 |
- |
Open for ordering. Closing on 06 May, 6pm. |
|
06 May 2011 |
- |
Closed. Tentative ETA TW 21 May. |
|
24 May 2011 |
- |
Shipment sent. ETA SG 04 Jun. |
|
30-31 May 2011 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #36 - Completed | |||
Date |
No. of Items |
Remarks |
|
03 Apr 2011 |
- |
Open for ordering. Closing on 18 Apr, 6pm. |
|
18 Apr 2011 |
- |
Closed. Tentative ETA TW 30 Apr. |
|
29 Apr 2011 |
- |
Shipment sent. ETA SG 14 May. |
|
11-12 May 2011 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #35 - Completed | |||
Date |
No. of Items |
Remarks |
|
18 Mar 2011 |
- |
Open for ordering. Closing on 25 Mar, 6pm. |
|
28 Mar 2011 |
- |
Closed.
Tentative ETA TW 07 Apr. |
|
10 Apr 2011 |
- |
Shipment sent. ETA SG 21 Apr. |
|
15-17 Apr 2011 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #34 - Completed | |||
Date |
No. of Items |
Remarks |
|
18 Feb 2011 |
- |
Open. Closing on 02 Mar, 6pm. |
|
02 Mar 2011 |
- |
Closed. Tentative ETA TW 18 Mar. |
|
25 Mar 2011 |
- |
Shipment sent. ETA SG 08 Apr. |
|
02-04 Apr 2011 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #33 - Completed | |||
Date |
No. of Items |
Remarks |
|
31 Jan 2011 |
- |
Open. Closing on 11 Feb, 6pm. |
|
11 Feb 2011 |
- |
Extended to 17 Feb, 6pm for Spring orders |
|
17-18 Feb 2011 |
- |
Closed. Tentative ETA TW 28 Feb. |
|
01 Mar 2011 |
- |
Shipment sent. ETA SG 14 Mar. |
|
10 Mar 2011 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #32 - Completed | |||
Date |
No. of Items |
Remarks |
|
08 Jan 2011 |
- |
Open. Closing on 21 Jan, 6pm. |
|
21 Jan 2011 |
- |
Closed. Tentative ETA TW 02 Feb. |
|
01 Feb 2011 |
- |
Shipment sent. ETA SG 16 Feb. |
|
11-12 Feb 2011 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #31 - Completed | |||
Date |
No. of Items |
Remarks |
|
23 Dec 2010 |
- |
Open. Closing on 07 Jan, 6pm. |
|
07 Jan 2011 |
- |
Closed. Pending replenishment. |
|
12 Jan 2011 |
- |
Shipment sent. ETA SG 26 Jan. |
|
22 Jan 2011 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #30 - Completed | |||
Date |
No. of Items |
Remarks |
|
13 Dec 2010 |
- |
Open. Closing on 22 Dec, 10pm. |
|
22 Dec 2010 |
- |
Closed. Pending replenishment. |
|
26 Dec 2010 |
- |
Tentative ETA TW 07 Jan. |
|
06 Jan 2011 |
- |
Shipment sent. ETA SG 14 Jan. |
|
14-15 Jan 2011 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #29 - Completed | |||
Date |
No. of Items |
Remarks |
|
24 Nov 2010 |
- |
Open. Closing on 04 Dec, 10pm. |
|
05 Dec 2010 |
- |
Extended to 07 Dec, 10am |
|
07 Dec 2010 |
- |
Closed. Tentative ETA TW 20 Dec. |
|
20 Dec 2010 |
- |
Shipment sent. ETA SG 31 Dec. |
|
26-27 Dec 2010 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #28 - Completed | |||
Date |
No. of Items |
Remarks |
|
15 Nov 2010 |
- |
Open. Closing on 22 Nov, 10pm. |
|
22-26 Nov 2010 |
- |
Closed. Payment made. Pending replenishment. ETA TW 03 Dec. |
|
05 Dec 2010 |
- |
Shipment sent. ETA SG 17 Dec. |
|
11-13 Dec 2010 |
- |
Shipment arrived. All items mailed/delivered. Thank you for supporting us. |
|
| Batch #27 - Completed | |||
Date |
No. of Items |
Remarks |
|
28 Oct 2010 |
- |
Open. Closing on 07 Nov, 10pm. |
|
07-08 Nov 2010 |
- |
Closed. Payment made. Pending replenishment. Tentative ETA TW TBA. |
|
15 Nov 2010 |
- |
Pending replenishment. Tentative ETA TW 19 Nov. |
|
17 Nov 2010 |
- |
Shipment sent. ETA SG 27 Nov. |
|
23-24 Nov 2010 |
- |
Shipment arrived. Preparing to mail out. All items mailed/delivered. Thank you for supporting us. |
|
| Batch #26 - Completed | |||
Date |
No. of Items |
Remarks |
|
10-16 Oct 2010 |
- |
Open. Closing on 22 Oct, 10pm. |
|
22 Oct 2010 |
- |
Closed. Payment made. Pending replenishment. Tentative ETA TW 06 Nov. |
|
04 Nov 2010 |
- |
Shipment sent. Tentative ETA SG 15 Nov. |
|
10-11 Nov 2010 |
- |
Shipment arrived. All items mailed/delivered. Thank you for supporting us. |
|
| Batch #25 - Completed | |||
Date |
No. of Items |
Remarks |
|
27 Sep 2010 |
- |
Open |
|
05-07 Oct 2010 |
- |
Closed. Payment made. Pending replenishment. Tentative ETA TW 15 Oct. |
|
18 Oct 2010 |
- |
Shipment sent. ETA SG 29 Oct. |
|
22 Oct 2010 |
- |
Shipment arrived. All items mailed/delivered. Thank you for supporting us. |
|
| Batch #24 - Completed | |||
Date |
No. of Items |
Remarks |
|
15-23 Sep 2010 |
- |
Closed. Payment made. Pending replenishment. Tentative ETA TW 08 Oct. |
|
08 Oct 2010 |
- |
Shipment sent. Tentative ETA TW 22 Oct. |
|
15-16 Oct 2010 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #23 - Completed | |||
Date |
No. of Items |
Remarks |
|
31 Aug - 05 Sep 2010 |
- |
Open. Closing by 10pm, 06 Sep 2010. |
|
06 Sep 2010 |
- |
Closed |
|
07 Sep 2010 |
- |
Pending replenishment. Tentative ETA TW 23 Sep. |
|
23 Sep 2010 |
- |
Shipment sent. ETA SG 07 Oct. |
|
29 Sep 2010 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #22 - Completed | |||
Date |
No. of Items |
Remarks |
|
21 Aug 2010 |
- |
Open. Closing by 10pm, 26 Aug 2010 |
|
26 Aug 2010 |
- |
Closed. Payment made. |
|
21 Aug 2010 |
- |
Pending replenishment. Tentative ETA TW 01 Sep. |
|
26 Aug 2010 |
- |
Closed. Payment made. |
|
31 Aug 2010 |
- |
Shipment sent. ETA SG 14 Sep. |
|
11-12 Sep 2010 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #21 - Completed | |||
Date |
No. of Items |
Remarks |
|
08 Aug 2010 |
- |
Open. Closing by 3pm, 15 Aug 2010 |
|
15 Aug 2010 |
- |
Closed. Payment made. |
|
16 Aug 2010 |
- |
Pending replenishment. Tentative ETA TW 20 Aug. |
|
27 Aug 2010 |
- |
Shipment sent. ETA SG 11 Sep. |
|
11-12 Sep 2010 |
- |
Shipment arrived. All items mailed/delivered. |
|
| Batch #20 - Completed | |||
Date |
No. of Items |
Remarks |
|
24 Jul - 05 Aug 2010 |
- |
Open. Closing by 11.59 pm, 06 Aug 2010. |
|
07 Aug 2010 |
- |
Closed. Payment made. |
|
08-12 Aug 2010 |
- |
Pending replenishment, tentative ETA TW 16 Aug. |
|
13 Aug 2010 |
- |
Shipment sent. ETA SG 27 Aug. |
|
24 Aug 2010 |
- |
Shipment arrived. Preparation to mail out. |
|
25 Aug 2010 |
- |
All items delivered/mailed. Thank you for supporting us. |
|
| Batch #19 - Completed | |||
Date |
No. of Items |
Remarks |
|
13-22 Jul 2010 |
- |
Open. Closing by 23 July. |
|
23-24 Jul 2010 |
- |
Closed. Payment made. Pending replenishment, tentative ETA TW 29 Jul. |
|
28 Jul 2010 |
- |
Pending replenishment, tentative ETA TW 03 Aug. |
|
30 Jul 2010 |
- |
Shipment sent. ETA SG 13 Aug. |
|
12 Aug 2010 |
- |
Shipment arrived. Preparation to mail out. All items mailed. Thank you for supporting us. |
|
| Batch #18 - Completed | |||
Date |
No. of Items |
Remarks |
|
24 Jun - 8 Jul 2010 |
- |
Open. Closing by 09 July. |
|
09 - 14 July 2010 |
- |
Closed. Payment made. 2 items pending replenishment. Tentative ETA TW 22 Jul. |
|
22 Jul 2010 |
- |
Shipment sent. ETA SG 04 Aug. |
|
31 Jul 2010 |
- |
Shipment arrived. Preparation to mail out. |
|
02 Aug 2010 |
- |
All items delivered. Thank you for supporting us. |
|
| Batch #17 - Completed | |||
Date |
No. of Items |
Remarks |
|
10-21 Jun 2010 |
- |
Closed |
|
22-28 Jun 2010 |
- |
Payment made. 1 item pending replenishment. Tentative ETA TW 08 Jul. |
|
07 Jul 2010 |
- |
Shipment sent. ETA SG 19 Jul. |
|
14-16 Jul 2010 |
- |
Shipment arrived. All items mailed/delivered. Thank you for supporting us. |
|
| Batch #16 - Completed | |||
Date |
No. of Items |
Remarks |
|
30 May 2010 |
- |
Open. Closing on 06 Jun. |
|
06-08 Jun 2010 |
- |
Closed. Payment made. 3 items pending replenishment. Tentative ETA TW 14 Jun. |
|
11 Jun 2010 |
- |
1 item pending. No ETA yet. |
|
16 Jun 2010 |
- |
Shipment sent. ETA SG 26 Jun. |
|
26 Jun 2010 |
- |
Shipment arrived. Preparation to mail out/deliver by 28 Jun. |
|
28 Jun 2010 |
- |
All items mailed/delivered. Thank you for supporting us. |
|
| Batch #15 - Completed | |||
Date |
No. of Items |
Remarks |
|
20-24 May 2010 |
- |
Open. Closing on 27 May. |
|
26-27 May 2010 |
- |
Closed. Payment made. |
|
28 May 2010 |
- |
5 items pending replenishment. Tentative ETA TW 07 Jun. |
|
31 May 2010 |
- |
2 items pending replenishment. Tentative ETA TW 03 Jun. |
|
07 Jun 2010 |
- |
Shipment sent. ETA SG 18 Jun. |
|
16 Jun 2010 |
- |
All items delivered/mailed. Thank you for supporting us. |
|
| Batch #14 - Completed | |||
Date |
No. of Items |
Remarks |
|
12 May 2010 |
0 |
Open |
|
17 May 2010 |
22 |
Closed. Payment made. |
|
26 May 2010 |
- |
Shipment sent to Singapore. ETA SG 07 Jun. |
|
02 Jun 2010 |
- |
All Items delivered/mailed. Thank you for supporting us. |
|
| Batch #13 - Completed | |||
Date |
No. of Items |
Remarks |
|
24 Apr 2010 |
6 / 15 |
Open |
|
26 Apr 2010 |
15 / 20 |
||
29 Apr 2010 |
40 |
Closed. Payment made. |
|
30 Apr 2010 |
- |
9 items pending replenishment |
|
03 May 2010 |
- |
9 items pending replenishment.
Tentative ETA (TW) 11 May |
|
04 May 2010 |
31/40 |
31 shipped (ETA SG 17 May). 9 in next shipment. |
|
13 May 2010 |
- |
First batch delivered/mailed. 1 item tentative ETA 19 May. |
|
18 May 2010 |
9/40 |
9 shipped (ETA SG 31 May/1 Jun) |
|
24-25 May 2010 |
- |
Shipment arrived. Second batch delivered/mailed. Thank you for supporting us. |
|
| Batch #12 - Completed | |||
Date |
No. of Items |
Remarks |
|
13 Apr 2010 |
7 / 15 |
Open |
|
16 Apr 2010 |
9 / 15 |
||
20 Apr 2010 |
68 |
Closed. Payment made. 10 items pending replenishment. Tentative ETA TW 2 May. |
|
27 Apr 2010 |
59/68 |
59 shipped (ETA SG 6 May). 9 in next shipment. |
|
29 Apr 2010 |
- |
5 items pending replenishment.
Tentative ETA (TW) 11 May |
|
04 May 2010 |
8/68 |
8 shipped (ETA SG 17 May). 1 in next shipment. |
|
08 May 2010 |
- |
First batch delivered/mailed. |
|
11 May 2010 |
- |
1 item tentative ETA TW 14 May |
|
13 May 2010 |
- |
Second batch delivered/mailed. |
|
18 May 2010 |
1/68 |
1 shipped (ETA SG 31 May/1 Jun) |
|
24-25 May 2010 |
- |
Shipment arrived. Third batch delivered/mailed. Thank you for supporting us. |
|
| Batch #11 - Completed | |||
Date |
No. of Items |
Remarks |
|
29 Mar 2010 |
6 / 15 |
Open |
|
31 Mar 2010 |
8 / 15 |
||
02 Apr 2010 |
13 / 15 |
||
06 Apr 2010 |
21 |
Closed. Payment made. 12 items pending replenishment. |
|
12 Apr 2010 |
- |
8 items pending.
Tentative ETA (TW) 16 Apr. |
|
16 Apr 2010 |
- |
5 items pending.
Tentative ETA (TW) 24 Apr. |
|
19 Apr 2010 |
- |
5 items pending.
Tentative ETA (TW) 30 Apr. |
|
23 Apr 2010 |
16/21 |
16 shipped (ETA SG 4 May). 5 in next shipment. |
|
04 May 2010 |
19/21 |
3 shipped (ETA SG 17 May). 2 in next shipment. |
|
08 May 2010 |
- |
First batch delivered/mailed 2 items tentative ETA TW 17 May. |
|
18 May 2010 |
2/21 |
2 shipped (ETA SG 31 May/1 Jun) |
|
24-25 May 2010 |
- |
Shipment arrived. Second batch delivered/mailed. Thank you for supporting us. |
|
| Batch #10 - Completed | |||
Date |
No. of Items |
Remarks |
|
10 Mar 2010 |
0 / 15 |
Open |
|
19 Mar 2010 |
21 |
Closed. Payment made. 13 items pending replenishment. |
|
05 Apr 2010 |
- |
1 item pending replenishment |
|
07 Apr 2010 |
- |
Parcel shipped to SG today. ETA 15 Apr. 1 outstanding item to be shipped in next shipment. |
|
15 Apr 2010 |
- |
Parcel arrived. Preparation to mail out by 16 Apr. |
|
16 Apr 2010 |
- |
20 items mailed. Thank you for supporting us. |
|
20 Apr 2010 |
- |
Outstanding item to be shipped by 23 Apr. ETA (SG) 03 May. |
|
30 Apr 2010 |
- |
1 last item mailed. Thank you for supporting us. |
|
| * Note: Delivery for Batch #10 heavily impacted by shortage of resource and materials at manufacturers' end. | |||
| Batch #9 - Completed | |||
Date |
No. of Items |
Remarks |
|
26 Feb 2010 |
10 / 15 |
Open |
|
08 Mar 2010 |
20 |
Closed |
|
10 Mar 2010 |
22 |
Payment made. 6 items pending replenishment. |
|
14 Mar 2010 |
- |
4 items pending replenishment |
|
05 Apr 2010 |
- |
1 item pending replenishment |
|
06 Apr 2010 |
- |
Parcel shipped to SG today. ETA 14 Apr. 1 outstanding item to be shipped in next shipment. |
|
15 Apr 2010 |
- |
Parcel arrived. Preparation to mail out by 16 Apr. |
|
16 Apr 2010 |
- |
21 items mailed. Thank you for supporting us. |
|
20 Apr 2010 |
- |
Outstanding item to be shipped by 23 Apr. ETA (SG) 03 May. |
|
30 Apr 2010 |
- |
1 last item mailed. Thank you for supporting us. |
|
| * Note: Delivery for Batch #9 heavily impacted by shortage of resource and materials at manufacturers' end. | |||
| Batch #8 - Completed | |||
Date |
No. of Items |
Remarks |
|
07 Feb 2010 |
0 / 15 |
Open |
|
09 Feb 2010 |
1 / 15 |
Seller opens throughout Chinese New Year. All orders welcome. |
|
18 Feb 2010 |
21 |
Accepting orders till 21 Feb |
|
22 Feb 2010 |
- |
Payment made. All items available. |
|
23 Feb 2010 |
- |
Parcel shipped to SG today. ETA 4 Mar 2010. |
|
28 Feb 2010 |
- |
Items arrived. Preparation to mail out. |
|
01 Mar 2010 |
- |
Items mailed. Thank you for supporting us. |
|
| Batch #7 - Completed | |||
Date |
No. of Items |
Remarks |
|
25 Jan 2010 |
0 / 15 |
Open Note: Items will reach after CNY/V'day |
|
28 Jan 2010 |
8 / 15 |
||
30 Jan 2010 |
12 / 15 |
||
02 Feb 2010 |
17 / 20 |
Extended to 20 items |
|
04 & 05 Feb 2010 |
20 |
Closed. Payment made. |
|
14 Feb 2010 |
- |
3 items out of stock. Notified customers to confirm replacements. |
|
23 Feb 2010 |
- |
Parcel shipped. ETA 4 Mar 2010. |
|
28 Feb 2010 |
- |
Items arrived. Preparation to mail out. |
|
01 Mar 2010 |
- |
Items mailed. Thank you for supporting us. |
|
| Batch #6 - Completed | |||
Date |
No. of Items |
Remarks |
|
20 Jan 2010 |
2 / 15 |
Open. Closing early for pre-CNY arrival. |
|
21 Jan 2010 |
8 / 15 |
||
22 Jan 2010 |
21 |
Closed |
|
25 Jan 2010 |
21 |
Payment made. All items available. Awaiting shipment notice. |
|
26 Jan 2010 |
21 |
Parcel shipped. ETA 6 Feb 2010. |
|
02 Feb 2010 |
- |
Items arrived. Preparation to mail out. |
|
03 Feb 2010 |
- |
Items mailed. Thank you for supporting us. |
|
| Batch #5 - Completed | |||
Date |
No. of Items |
Remarks |
|
26 Dec 09 |
0 / 15 |
Open |
|
13 Jan 10 |
19 / 20 |
Extended to 20 items |
|
15 Jan 10 |
22 |
Closed |
|
18 Jan 10 |
- |
Payment made. 2 items ETA TBA. |
|
19 Jan 10 |
- |
1 item ETA TBA |
|
25 Jan 10 |
- |
Parcel shipped. ETA 5 Feb 2010. |
|
02 Feb 10 |
- |
Items arrived. Preparation to mail out. |
|
03 Feb 10 |
- |
Items mailed. Thank you for supporting us. |
|
| Batch #4 - Completed | |||
Date |
No. of Items |
Remarks |
|
12 Dec 09 |
0 / 15 |
Open |
|
23 Dec 09 |
20 |
Closed |
|
26 Dec 09 |
21 |
Payment made |
|
29 Dec 09 |
- |
Parcel shipped today. ETA 9 Jan. |
|
04 Jan 10 |
- |
Parcel arrived. Preparation to mail out. |
|
05 Jan 10 |
- |
Items mailed. Thank you for supporting us. |
|
| Batch #3 - Completed | |||
Date |
No. of Items |
Remarks |
|
29 Nov 09 |
3 / 15 |
Open |
|
06 Dec 09 |
34 |
Closed |
|
07 Dec 09 |
- |
Payment made |
|
17 Dec 09 |
- |
D!VA Special: Parcel shipped by express courier today to ensure items reach in time for X'mas! |
|
21 Dec 09 |
- |
Parcel arrived. Preparation to mail out by tomorrow. |
|
23 Dec 09 |
- |
All items mailed/delivered. Thank you for supporting us. |
|
| Batch #2 - Completed | |||
Date |
No. of Items |
Remarks |
|
09 Nov 09 |
0 / 15 |
Open |
|
27 Nov 09 |
30 |
Closed. Paid supplier today. |
|
03 Dec 09 |
- |
Parcel shipped today. Estimated to arrive SG on 12 Dec. |
|
12 Dec 09 |
- |
All items mailed. Thank you for supporting us. |
|
| Batch #1 - Completed | |||
Date |
No. of Items |
Remarks |
|
14 Oct 09 |
0 / 15 |
Open |
|
02 Nov 09 |
15 / 15 |
Closed |
|
04 Nov 09 |
19 |
Paid supplier today.
2 items ETA 10 Nov. |
|
11 Nov 09 |
- |
Parcel shipped today. Estimated to arrive SG on 20 Nov. |
|
21 Nov 09 |
- |
All items mailed. Thank you for supporting us. |
|